Energy Group

Ağaoğlu Energy Group seeks for further opportunities in renewable energy. ENERGY GROUP

Targeting a key role in renewable energy sector as in construction and tourism sectors in Turkey.

With wind, hydro and biomass energy projects, also planning to invest in conventional energy projects in line with its strategy to diversify the energy generation sources.

5 energy projects under 5 companies;

3 WPP Projects totalling to 183.9 MW

1 HEPP Project totalling to 21.5 MW

1 Biomass Energy Project with 12.0 MW installed capacity

The total portfolio will have 217.4 MW installed capacity with an expected annual generation of 775 GWh/year. The total projects developed until today is 520 MW. Mersin WPP (42 MW) was commissioned in 2010, Şah WPP (105 MW) in 2011, Edincik WPP (77 MW) in 2013 and Seferihisar WPP (21 MW) in 2016. Kartal WPP (49 MW) will be commissioned in 2020

The total portfolio will have 217.4 MW installed capacity with an expected annual generation of 775 GWh/year.

Ağaoğlu Energy Group has a wholesale trading company to have an effective sale channel for its own generation portfolio

Ağaoğlu Energy Group seeks for further opportunities in renewable energy.

PORTFOLIO OVERVIEW
OP UC TOTAL
NUMBER OF PLANTS 4 1 5
Wind 2 1 3
HEPP 1 0 1
Biomass 1 0 1
INSTALLED CAPACITY (MW) 121,4 96 217,4
Wind 87,9 96 183,9
HEPP 21,5 0 21,5
Biomass 12 0 12
GENERATION CAPACITY (GWH/YEAR) 433 332 775
Wind 281 332 613
HEPP 68 0 68
Biomass 94 0 94

Past Transactions Summary

mesinsahwpp
  • In total 147 M W and 450 GWh/year production.
  • Mersin WPP was developed at 2008 and Şah WPP at 2009.
  • Mersin WPP was commissioned in March 2010 and Şah WPP in May 2011.
  • Projects are among the best in the country interms of capacity factor.
seferihisar-wpp
  • 21 MW and 70 GWh/year production.
  • Seferihisar WPP was developed between 2012 and 2015.
  • Seferihisar WPP was commissioned in June 2016.
  • The project is located in Çeşme Region where is one of the most windy regions of the country.
edincik-wpp
  • 77 M W and 270 GWh/year production.
  • Edincik WPP was developed between 2009 and 2011.
  • Edincik WPP was commissioned in July 2013 .
  • This Project was also one of the best interms of capacity factor.
kartal-wpp
  • 49 MW and 170 GWh/year production.
  • Kartal WPP was developed between 2013 and 2018.
  • Kartal WPP will be commissioned at the end of 2020.
  • Kartal WPP is in a region where is one of the most preferred for WPP Projects in the country.